HOME | LOGIN
Goalline Sports Administration Systems

Several improvements have already been made to the facility since Curry College took over management in September of 2010; some of these have been listed below:

  • Power washed and painted the interior of the building where needed, adding the Milton/Curry stripe and Milton logo on the wall of the Zamboni room.
  • Painted the locker rooms.
  • Cleaned and replaced the rubber flooring in the locker rooms, bathrooms, and public areas.
  • Installed new lighting in the locker room showers.
  • Fixed ventilation/installed systems in the locker rooms and warming area.
  • Purchased Milton and Curry logos and installed them at center ice.
  • Professionally cleaned the boards.
  • Purchased and hung new Curry banners.
  • Decreased the ice thickness to average of 1'1/2'' for better and more manageable ice conditions.
  • Purchased new Milton game nets.
  • Made several improvements to the rink Zamboni.
  • Fixed the two garage doors that service the Zamboni.
  • Installed a Low Emissivity Ceiling and Sidewall Insulation. 
     
  • Completed several board repairs.
  • Installed a new Milton banner and a Canadian flag.
  • Reorganized the existing banners.
  • Added digital signage, cable television and free wifi.